Saturday 3 December 2022

Year 22 - Week 48

 The Psychobombs console

Modeled this week from scratch to finish. Not a big deal because most of the detailled elements were already done long before. Actually a good exercice since I spotted some elements on the central console that I could upgrade on some models


Sunday 6 November 2022

Year 22 - Week 45

 Year 22 - Week 45 (around early nov)    

HQ 3d desk should now be considered complete (some slight adjustment thoug)


HQ Rectangular pannel (vers 1)

Added instructions on the screen using a paid addon


Another console was updated with screens







Thursday 14 April 2022

Year 2022 - Week 16

 Year 2022 - Week 16

Some upgrade on Psycho Dept

Mode uploaded to sketchfab

https://sketchfab.com/3d-models/psych-dept-freeman3-da7bcb7a87a047ec8e545b5c8ee37441


Upgrades on the MKIV recording system

Slight upgrade on the screen, some decals added too


Skydiver console

Two versions of the drum console were made. I made both. I shall use one for Skydiver interior scene, the other one will be of some use for the doctor office



Tuesday 29 March 2022

Year 2022 - Week 14

 Year 2022 - Week 14

SID (aka Space Intruder Detector) work done last week

- SID Interior showcased in facebook last week



- SID Spaceship uploaded to sketchfab


Moonbase Leisure Sphere

- Luigi Colani Relax TV chair added to the scene. 360 view uploaded to artstation


Skydiver Drum Console. 

First version started this week. Should be finished at the end of the week

Psycho analyst department

Check Flight Path at 11:47 for the window leading to the exam room et 18:50 exam room


Monday 21 March 2022

Year 2022 - Week 12

 SHADO Radar Box

Some alterations were made to the radar box. This includes

- New radar screen

- Some shape adjustment

- Added Scotch tape boxes for aestitetics purposes



SHADO Heaquarters

- on the machine F (at the far right when you see the wall console, labels were remade to match what is seen onscreen

- mural boards were upgraded to match the ones on screen



Dalotek

Some upgrades to the central pillar, with controls on all the trapezes




Others

Some improvements were done in the last few week for SID and the moon tank. Nothing to show anyway

Tuesday 15 February 2022

Year 2022 - Week 8

 SHADO Folder

A folder for all SHADO documents was digitally reproduced this week in Blender

See below an exemple of it on a moonbase desk

SHADO Ground Headquarters.

Some enhancements to the room was made by adding the green mural boards, and setting the size of the radar box that I had

Upgrades available on artstation

Skydiver interior

In the Identified episode is a clear view of the biggest oscilloscope. I have yet to identify the brand and reference model. Well, I know I have already

SHADO Radar

I have finally made the SHADO Radar which is the last piece of equipment that I hadn't modelled in the Underground headquarters. Nailed it ! I have included it already in the Dalotek facility main room. 




2022 Week 7

2022 - Week 7

Moonbase sleep sphere

Project finished this week. Most of  it was already done, time was spent on assembling the files into a single one, adding the inflated bed among other, adding invented elements to close the room. 

The finishedfiled is available for sale in sketchfab, 360 views are also available on artstation



Moonbase command sphere

Huge progress on the sphere. Among others the wall consoles were built at the end of the week but wall desks were also designed so all walls are filled. It appears discovered on week 8) that I have to resize (x1.0625) the room a bit as one column of wall consoles is missing between the moon and the planetarium (see identifed)

See progress made in artstation




Saturday 29 January 2022

Year 2022 - Week 5

 Year 2022 - Week  5

Ms. Ealand room

File more or less done. One 360° view uploaded to artstation. Might be upgraded one day or another with correction to the cloth hanger (porte manteaux), adding some SHADO paperwork and pen if needed.

Moonbase SHADO Sphere. 
Very big upgrade this week as all the elements are put in one single room. Models should be done at the end of february (let's be bold !)

Earth Head quarters
Kill straker 1:30 strapontin greenbox

Moonbase control sphere layout
1-
-
2 Entrée sas
3 Bureau
-
4
- Hublot
5- Hublot
6-Mappemonde
-Bureau 
7 consoles
- Consoles
8 Consoles avecluminions jaunes
- Carte noir identified 13-27


Saturday 22 January 2022

Year 2022 - Week 04

 Year 2022 - Week 04

Some work on the psycho department

I might use some artwork for the corridor section regarding the entrance 



Some work started on the Shadair X-ray / Albatross Seaplane Cockpit


Upgraded slightly the skydiver interior with an oscilloscope

Also some upgrades on the mural board on eadquarters
Board Muraux3.blend
Computer Wall : Maxine F has been upgraded



Seegul Xray cabin : 
redimensionner à 1.579 sur l'axe X pour le board mural 3x5 boutons




Sunday 16 January 2022

Year 2022 - Week 03

 Project Bazooka

- Flight Plan

- Time lash


Psychological center

- Computear Affair


Skydiver

oscilloscope form Computer affaire to Skydiver main room (should be identified because a close up appears)


Inside Shado Mobile

- Found additionnals screens with numbers identifications

- Found Mab

- should be added a block machine that appears behing some production photos.